Was there ever a code cycle that allowed neutral wires and equipment grounds to be bonded at a sub panel with a four wire system? It is a issue that I come across on a considerable about of older homes. It make me wonder if there was ever a point that it was acceptable in the NEC or a major fail on for the local authority.