Dean83169
Senior Member
In a commercial building which is Primary and which is Secondary for the service.
Would the cold water which extends 10' in the ground ( city main ), building steel, a # of ground rods driven through the slab into the earth; or would ANY of those be listed for primary and secondary in the code. If this is the case of using building steel, can you use the building steel with full size and then tap off the steel on the other side of the building to bond the cold water which would be your secondary.
Would the cold water which extends 10' in the ground ( city main ), building steel, a # of ground rods driven through the slab into the earth; or would ANY of those be listed for primary and secondary in the code. If this is the case of using building steel, can you use the building steel with full size and then tap off the steel on the other side of the building to bond the cold water which would be your secondary.