Proper way to retro fit facility for new use?

Status
Not open for further replies.

mta145

Member
I have a industrial company that has a 800 amp 480v service with existing load running a bunch of equipment now they want to add 18 welding stations and a 100hp and 50 hp press to there shop. they have only been there about 2mo. and have been adding stuff throughout this time period. What is the best solution to get my existing load demands so i can figure out how much i can add and to which panels?? Im starting to make a one line of the service with connected loads is this the most efficient way?
 