I have a property line box were I'm working now. We have 10 RGC with a set of 750 kcmil wires inside running from the box to the end box inside the building.We bonded each conduit with a #2/0 to the metal frame of the switch gear. We have a MBJ in place,ground rod,water groung and building steel bonded together . The inspector require me to drive a ground road inside the box and bonding again the pipe to the ground rod. Is it correct?
code se tion?
I tough that the only situation were you have to bond the pipe in both end is if you had a PVC on the middle of you run.thx
code se tion?
I tough that the only situation were you have to bond the pipe in both end is if you had a PVC on the middle of you run.thx