Has anyone ever had experience or knowledge about building ab electrical service room on the second floor of a building.
We're trying to find a space to build a new service for a customer and the second floor is kind of the only option.
From pseg pad mount there would be about 8 sets of 4" with 750 mcm aluminum
Was curious if they would allow me this. Possibly if I encased SEC in concrete?
Any insight would be great
Sent from my SM-S926U using Tapatalk
	
		
			
		
		
	
				
			We're trying to find a space to build a new service for a customer and the second floor is kind of the only option.
From pseg pad mount there would be about 8 sets of 4" with 750 mcm aluminum
Was curious if they would allow me this. Possibly if I encased SEC in concrete?
Any insight would be great
Sent from my SM-S926U using Tapatalk
 
				
 
 
		