Hello,
Is having a pull box next to a pad mounted control cabinet in the field a good practice? We'll have several pad mounted NEMA 4 Cabinets installed throughout an industrial site, and I was wondering if I should terminate feeder conduits directly into the enclosure or route them through an adjacent pull box. I'll have branch conduits going from the cabinet to field devices, so I think there is a benefit of having a pull box. I think another advantage of the pull box would be if the power cable and fiber are pulled in advance, I can have the cabling coiled up in the PB and then run a short conduit to the pad and erect the enclosure at a later time without having to worry about possibly damaging the cable during the installation of the cabinet.
Just thinking out loud and hoping for opinions on this one.
Thanks,
EE
Is having a pull box next to a pad mounted control cabinet in the field a good practice? We'll have several pad mounted NEMA 4 Cabinets installed throughout an industrial site, and I was wondering if I should terminate feeder conduits directly into the enclosure or route them through an adjacent pull box. I'll have branch conduits going from the cabinet to field devices, so I think there is a benefit of having a pull box. I think another advantage of the pull box would be if the power cable and fiber are pulled in advance, I can have the cabling coiled up in the PB and then run a short conduit to the pad and erect the enclosure at a later time without having to worry about possibly damaging the cable during the installation of the cabinet.
Just thinking out loud and hoping for opinions on this one.
Thanks,
EE