I always get this answer misinterpreted. Can you have 2 different panels sharing the same pull box. where can I find it in the NEC?
As long as you are not combining service conductors (no OCPD) with feeder conductors (with OCPD) in the same box or raceway you should be fine.I always get this answer misinterpreted. Can you have 2 different panels sharing the same pull box. where can I find it in the NEC?
As long as you are not combining service conductors (no OCPD) with feeder conductors (with OCPD) in the same box or raceway you should be fine.
Not covered by NEC apparently.Yet power companies around here are still hooking up Up and Down pole services without question.