I have a situation on a job where there is an existing pullbox that needs to be replaced. Sounds simple but the box is almost 7 feet wide and 4 feet tall. It also has 28 4" conduits in it. That asside it only has 20 inches of clearance in front. There is a chiller in the way. 110.26 says minimum 3 feet. Is there a grandfather rule that anyone knows I may be able to work with? I know it is going to cause a problem from install to inspection and I am trying to avoid having to tell the client they need to spend even more money on this. Thanks in advance for your advice.