I have a 200 amp single phase service, SE runs from the (pushmatic special) panel to the meter, ground runs next to it. I want to put a main breaker panel in-between the old panel and meter, and run the old panel off a 150amp breaker.
Any ideas for meeting the seperate ground for the subpanel requirement without replacing that SE?, or i could probably use feed through lugs, and make them both main panels, and just use the 6handthrowsrule to justify it?
I have a 200 amp single phase service, SE runs from the (pushmatic special) panel to the meter, ground runs next to it. I want to put a main breaker panel in-between the old panel and meter, and run the old panel off a 150amp breaker.
Any ideas for meeting the seperate ground for the subpanel requirement without replacing that SE?, or i could probably use feed through lugs, and make them both main panels, and just use the 6handthrowsrule to justify it?