Hello fellow forum readers and participants!
Got one that I haven't been able to get any good hits using Dr. Google. How do you add 60KW inverters to your panel schedules? When you're adding PV inverters to a new (or existing) electrical system and its time to update the panel schedule, what is the process or code references that need to be looked at? Before anybody says it, I've already sized my bus bars according to the code. How does it impact your connected load, the demand load, and the rest of the reporting going back to the source?
My building is a new admin building with ~500KW of solar being added. All the solar is being connected to the distribution system.
Got one that I haven't been able to get any good hits using Dr. Google. How do you add 60KW inverters to your panel schedules? When you're adding PV inverters to a new (or existing) electrical system and its time to update the panel schedule, what is the process or code references that need to be looked at? Before anybody says it, I've already sized my bus bars according to the code. How does it impact your connected load, the demand load, and the rest of the reporting going back to the source?
My building is a new admin building with ~500KW of solar being added. All the solar is being connected to the distribution system.