mikehughes8
Senior Member
- Location
- NC
Is all PVC conduit that is exposed considered to be "subject to damage" thus requiring Schedule 80 PVC. In my case the PVC protects USE cable as it emerges from grade and connects to service equipment. In my view, although exposed it is unlikely that the conduit / cable will become damaged.
Thanks in advance
Thanks in advance