pvc construction undergr service

Status
Not open for further replies.

louie99_4

New member
i have been told running underground service with pvc in 18 inch trench to manufactured home 50 feet that the construction must be complete before pulling the wires (100a four- 2/0 alum) as opposed to separatly constructing as pulling to tower. would appreciate input to this subject. tom glastra :confused:

Edited to remove the e-mail address. Please use the PM system to trade e-mail addresses. Charlie

[ January 01, 2005, 08:29 AM: Message edited by: charlie ]
 
Re: pvc construction undergr service

I think you may be refering to Section 300.18(A) of the NEC. Read that section and let us know if that answers your question.
 
Re: pvc construction undergr service

louie99_4,Is this 18" of trinch of 50'.Is that the total length of trinch,or the total length of PVC raceway."550.32"
 
Re: pvc construction undergr service

Louie has been the electrical trade for over 25 years. I moved his post and should not have done that. Louie, I apologize.
 
Status
Not open for further replies.