First off in MA and came across this today. 3" Schedule 80 rising out of the ground. There is no expansion fitting. Typically an expansion fitting would be installed due to frost heaves but I was not able to find in the code where one would be required. there is only about 40" of conduit sticking out so thermal expansion would not come into play. Am I missing it in the code somewhere?