Hello all,
I need to run approx. 2000' of Sch 80 PVC in a 36" deep trench - 3 parallel 4" pipes (I realize I can use smaller pipe but prefer the larger) - containing 3 sets of 350 kcmil THHN (1 set - 4 wires/pipe) 3ph/208/1200A.
Question #1: Not 100% sure if it is code, but I always practice putting a pull box or conduit body every 100' when I run pipe in a building or tunnel or similar. Is it a requirement to have a underground p.b./'manhole' every 100' or is it just for pulling purposes when using this practice and do I need p.b.s every 100' for this run?
Question #2: How much Voltage Drop can I expect for running this long distance? Do I need a boost XFRM in the run to get my Voltage up at the end?
Thanks!
I need to run approx. 2000' of Sch 80 PVC in a 36" deep trench - 3 parallel 4" pipes (I realize I can use smaller pipe but prefer the larger) - containing 3 sets of 350 kcmil THHN (1 set - 4 wires/pipe) 3ph/208/1200A.
Question #1: Not 100% sure if it is code, but I always practice putting a pull box or conduit body every 100' when I run pipe in a building or tunnel or similar. Is it a requirement to have a underground p.b./'manhole' every 100' or is it just for pulling purposes when using this practice and do I need p.b.s every 100' for this run?
Question #2: How much Voltage Drop can I expect for running this long distance? Do I need a boost XFRM in the run to get my Voltage up at the end?
Thanks!