I have a customer that's considering updating one room in the plant to Class I Division II and wants me to give him a cost estimate. As of now he has EMT conduit with set screw fittings and normal J boxes with knockouts, etc. I have a few questions.
Does all of the conduit need to be changed to IMC or RGS with threaded couplings?
Do the boxes need to be changed from the regular steel J boxes?
There are a couple GFCI receptacles that are flush mounted in nail on boxes inside the wall so the wiring for them is also inside the wall. I don't know if it's NM or what. Should I disconnect them and run conduit to new ones or can I leave them in place with a certain type of cover on it or....?
They have a mixer with an open blade disconnect on one of the machines which also has a couple motors mounted on it. Does that disconnect need to be rated Class I Division II? Are those motors going to be ok in this environment? I think the code book defined this area as an area with contained flammables or something so I may be going overboard with my thinking.
Any help or information would be greatly appreciated.
Thank you.
Does all of the conduit need to be changed to IMC or RGS with threaded couplings?
Do the boxes need to be changed from the regular steel J boxes?
There are a couple GFCI receptacles that are flush mounted in nail on boxes inside the wall so the wiring for them is also inside the wall. I don't know if it's NM or what. Should I disconnect them and run conduit to new ones or can I leave them in place with a certain type of cover on it or....?
They have a mixer with an open blade disconnect on one of the machines which also has a couple motors mounted on it. Does that disconnect need to be rated Class I Division II? Are those motors going to be ok in this environment? I think the code book defined this area as an area with contained flammables or something so I may be going overboard with my thinking.
Any help or information would be greatly appreciated.
Thank you.