Quick question - what NEC section details rules on crossing over underground feeders in a trench. I'm upgrading to a 400A service, and downstream of the service disconnects I need to "cross-over" the direct burial cables going to different panels. I don't seem to be able to find the section. Ordinarily I always parallel these feeders, but my meter base and disconnect layouts do not support this. Thanks!
 
There are no rules in the NEC that relate to this. Local building codes need to be followed. With that said

I am closing this thread, in accordance with the Forum’s rules.

This site is designed for:

Contractors
Electricians
Engineers
Inspectors
Instructors

This NEC Forum is for those in the electrical and related industries.

Forum rules prohibit us from assisting a person to perform or assist others to do electrical work who are not qualified. The reason is that the forum’s owner does not want a person to get an answer to the question they asked, but not get answers to the other questions they should have asked and were unaware they needed to ask. Mike Holt Enterprises and the Moderators of this Forum do not wish to place you and your family in danger, by allowing others to give you too little information to ensure that the installation is safe
 
Status
Not open for further replies.
Top