Whole Home Service Load is 195A. But when calculating the load panel by panel individually we have a total load of 209A. (1) 200A Main Panel, (1) 50A Sub Panel, (1) 100A Sub Panel.
200A Main Has total load of 154A
50A Sub Panel Has total load of 17A
100A Sub Panel Has total load of 38A
Confused as to why the AHJ is calculating them individually even though they are all under their individual max load. Can anyone give me a direction to go here? It is much appreciated!