I have 500 panels with 10 strings each which is 50 strings total and 10 inverters.
We have local amendment that should main AC solar disconnect that is tapped ahead of building main AC service disconnect be switched off then the inverters along with each solar panels rapid shutdown should shutdown.
Local amendments says Means shall be provided when AC solar disconnect is tapped ahead of building AC disconnect to disconnect both the inverter as well as the solar panels.
The inverters used in projects do not initiate rapid shutdown when power is off and so rapid shutdown disconnects are provided about 50 of them.
I am thinking what means can be provided when one AC fused solar disco is shut off so does it shit off rapid shutdown switches 50 of them? Does anyone know?
We have local amendment that should main AC solar disconnect that is tapped ahead of building main AC service disconnect be switched off then the inverters along with each solar panels rapid shutdown should shutdown.
Local amendments says Means shall be provided when AC solar disconnect is tapped ahead of building AC disconnect to disconnect both the inverter as well as the solar panels.
The inverters used in projects do not initiate rapid shutdown when power is off and so rapid shutdown disconnects are provided about 50 of them.
I am thinking what means can be provided when one AC fused solar disco is shut off so does it shit off rapid shutdown switches 50 of them? Does anyone know?