I have commercial multi occupancy building with 8 tenants, one floor, and one of the tenants is ambulatory space with operation rooms, post and pre operation rooms, recovery rooms. The ambulatory space has swbd has feeder breakers with essential system which feed ATS one for each: life safety, equipment, critical. The essential system has emergency generator.
Normal side, the ambulatory space switchboard then is fed from building main service switchboard feeder breaker. The main service switch board has incoming electric utility service and other feeder breakers also feed other tenants.
I was wondering can the ambulatory space above case switchboard be fed from main service switchboard feeder breaker or does it need its own electric utility service or does it need to be connected line side of main service switchboard main breaker?
Normal side, the ambulatory space switchboard then is fed from building main service switchboard feeder breaker. The main service switch board has incoming electric utility service and other feeder breakers also feed other tenants.
I was wondering can the ambulatory space above case switchboard be fed from main service switchboard feeder breaker or does it need its own electric utility service or does it need to be connected line side of main service switchboard main breaker?