Our project has an existing duct bank which has about (18) 4" conduits in it. Since part of the duct bank is not deep enough for our project, we have to low that part for another 5'. I am thinking to add two manholes at each end of that part of duct bank and built new duct bank (lower) between two manholes. We have (7) 800A energized feeders in the duct bank to (7) different electrical rooms. We have to replace the feeder one at a time and keep others live. My questions are (1) how can we break the concrete encasement without breaking the PVC conduits in duct bank? (2) how can we figure out which two conduits have the set of cables for the same feeder before we break the PVC conduits?:?
We have to figure out the answers to the two questions. Then we maybe able to replace the feeder one at a time. Thank you all for your help.
We have to figure out the answers to the two questions. Then we maybe able to replace the feeder one at a time. Thank you all for your help.