In a small city area, what do you think is reasonable to replace a 100A, single phase weather head, meter base, and service entrance cable that is maximum 30 feet from weather head to meter base to load center?
Plus a new 6 AWG water service ground (about 20 feet away)...
2 new grounding rods...
The house is 2 stories high, and should go up fairly easily.
...
As an additional quote, they wanted to run a piece of MC cable from the boiler 10 feet to a 1900 box to replace the NM cable that is currently there and hang a kitchen chandelier.
A permit would be pulled and have a city inspection of course.
Thanks for any thoughts on this...
Plus a new 6 AWG water service ground (about 20 feet away)...
2 new grounding rods...
The house is 2 stories high, and should go up fairly easily.
...
As an additional quote, they wanted to run a piece of MC cable from the boiler 10 feet to a 1900 box to replace the NM cable that is currently there and hang a kitchen chandelier.
A permit would be pulled and have a city inspection of course.
Thanks for any thoughts on this...