102 Inspector
Senior Member
- Location
- N/E Indiana
- Occupation
- Inspector- All facets
Still under 2008 Edition, another inspector says that a meter base mounted 5 feet off the ground with the panel mounted back to back needs raceway seals if the service laterals come into the meter through an underground service. Our area is not prone to flooding and I do not read this section the same. If water is going up 5 feet, there are greater problems. What is the intent of this section and what would be considered an underground distribution system?