X xformer Senior Member Location Dallas, Tx Occupation Master Electrician Jul 28, 2011 #1 What code section requires conduit runs to be complete before conductors are pulled in?
eric9822 Senior Member Location Camarillo, CA Occupation Electrical and Instrumentation Tech Jul 28, 2011 #2 300.18(A)