I have a question for folks who work for in MEP field. For radiology equipment (MRI, CT, NUC Med, etc), we typically show electrical feeder from our panel to xray main disconnect as well as providing power to the room lighting and all accessories support as called out per radiology equipment vendor drawings.
EC will need to refer to radiology installation drawing, details and do the all installation requirement.
We (MEP engineer) is not supposed to design all conduits, boxes, supports between parts, controls that work with the xray machine. This will be the responsibility of radiology manufacturer and designed by them, is it correct?
EC will need to refer to radiology installation drawing, details and do the all installation requirement.
We (MEP engineer) is not supposed to design all conduits, boxes, supports between parts, controls that work with the xray machine. This will be the responsibility of radiology manufacturer and designed by them, is it correct?