Would a raised floor system in a office building fall under Article 604 Manufactured Wiring Systems ? The system for example would be the Hubbell Connexion Zone Distribution System. The zone distribution boxes are hard wired from electrical panel to zone box i know for what ever wiring method you used it would have to strapped accordingly. Do the extender cables (like reloc) that go to floor boxes installed in raised floor have to be straped?