Ready for Electric Final Inspection in Tennessee..

For my own use I have rolled out a 40' piece of Romex 12/3 w ground. I removed a knock out from the bottom of my temporary and ran the Romex (thru a strain relief) into a 20A 240V breaker in the temp panel.

I have it rolled across the yard and into the back door in the utility room where my panel is. It is connected to a 20A breaker (an 'future use' breaker/wire for a split unit HVAC i may do later on) in my panel. This allows me to use /test all circuits during electrical.

My question is how do I 'correctly' power the panel so the inspector can test as required during his inspection?
From what I see they expect to have the system energized at final..

Thanks in advance.
 
I am closing this thread in accordance with forum rules. We are not allowed to assist a person who is not an electrician to perform their own electrical installation work. Engineers are welcome, even encouraged, to participate, but not in the role of DIY installers.

Feel free to stick around. I, for one, have gained far more than I have contributed oner the past 20+ years.
 