mltech
Senior Member
- Location
- Ft. Lauderdale
I have a 400amp, 120/240 delta highleg system that is feeding an existing building. We are replacing the tired existing meters and disconnects and would like to reduce the high leg coming into the meter and gutter. From the service I am feeding one 200amp, (3 phase) panel that has an A/C at 100amps, the rest is lighting and Receps in a warehouse and another 125amp, (1 phase) panel for lighting and receps in the office area. How do I reduce my high leg? since it only feeds a 200 amp panel but is in a 400 amp
service?
service?