Hello all,
I am new to the site.
I am trying to understand the Load calculation rules for calculating the load for Reduntan HVAC system.
I am tasked with setting an electrical service for a remote pre-cast building that has two complete HVAC systems. By design they will never operate at the same time. They are conroled by a programable thermostat that changes the lead unit weekly each being sized sepratly to handel the total Heating or cooling load required. Do I have to calculate the load of the second unit at all or a precentage of that load? If anyone can point me to the relevant article in the NEC or if someone has dealt with this issue specificly I would be very gratefull.
Thanks
I am new to the site.
I am trying to understand the Load calculation rules for calculating the load for Reduntan HVAC system.
I am tasked with setting an electrical service for a remote pre-cast building that has two complete HVAC systems. By design they will never operate at the same time. They are conroled by a programable thermostat that changes the lead unit weekly each being sized sepratly to handel the total Heating or cooling load required. Do I have to calculate the load of the second unit at all or a precentage of that load? If anyone can point me to the relevant article in the NEC or if someone has dealt with this issue specificly I would be very gratefull.
Thanks