Brief scope of work:
New location for existing Transformer
New 3500 amp switchboard in new Central Plant.
Breaker in switchboard of new Central Plant to feed existing 1600 switchboard in room 1C.
Contractor wants to pull new wires (4 -500 mcm 1-#2 Ground) from new switchboard to existing Transformer location to where a junction box will be installed. These 5 wires will be tapped at the existing transformer location to the existing wires feeding the existing switchboard in room 1C via junction box. Here is my concern, the existing wires from Transformer to existing switchboard in 1C have 3-500mcm and 1-2/0. Is this legal or is a Ground wire required?
Second question is : there is a 10,000 gallon diesel tank in the ground. The new secondary wires from new transformer location are less than 2' away from the tank? What is the minimum distance these 9 -3" secondary conduits should be away from the under ground diesel tank?
Thank You for Your Help
Shortckt
Help with two questions: