Hello all, I'm working on a project where we have been asked to specify a generator for an regenerative elevator from Otis. After doing some research it appears that the regenerative load, roughly 7kW in our case, could be an issue as this load is typically taken in by the building system and we will hardly have any other loads besides the elevator motor. Schindler appears to have this figured out as they can disable the regen during a normal power outage. Has anyone else run into this situation before? Thanks in advance.
http://www.schindler.com/content/us/internet/en/modernization/energy-savings/_jcr_content/rightPar/downloadlist/downloadList/163_1336060675322.download.asset.163_1336060675322/AC%20Regenerative%20Module%20Sheet_100711.pdf
http://www.schindler.com/content/us/internet/en/modernization/energy-savings/_jcr_content/rightPar/downloadlist/downloadList/163_1336060675322.download.asset.163_1336060675322/AC%20Regenerative%20Module%20Sheet_100711.pdf