Inspector56
New member
- Location
- Amarillo,Texas Potter
Is it ok to run your ufer GEC to a sub panel and drive and additional ground rod at the service or service disconnect. I dont think it is allowed because I thought your GEC had to be contiuous from the attachment point to the service disconnect. By the way the feeder is 4 wire single phase from the service disconnect to the sub panel