I am working on a large Industrial "shell building" that consists of many LED highbay fixtures. On previous projects for this builder we've been using Lithonia Reloc cabling between fixtures. Between rows of lights, the starter box / branch wiring will be THHN cable in EMT conduit. Due to the size of the building to furthest row of lights will need to be #6awg due to voltage drop. My question is does the Reloc cabling leaving that starter box and then between each fixture have to be #6awg as well. Or is Reloc considered part of the fixture assembly and can therefore remain #12awg?