Relocate Service

Status
Not open for further replies.

MBLES

Senior Member
customer wants to move 800a service 40'. The customer is building on or near exisitng service location.The existing service feeds 3-200a panels @Temp buildings and one 200a panel at H frame, once job is complete the service will be removed. The 3-200a feeders run over head to Temp buildings. The 3- 200 amp feeders will remain but I need to feed from new service. MY Idea IS. Can I install a 600 disconnect then tap off the load side to feed each disconnect separately or does a 200a disconnect need to be provided for each feeder. The reason I am trying keep it under same 600 disconnect is to 1st keep from involving POCO again. I can just turn off power and because customer wants to install generator for all three discoonects near temp buildings. in future growth. i can turn off power with 600 disconnect when i install genertor. you guys see any problems with this? please let me know and provide code reference.
 

Attachments

  • VZW Service.jpg
    VZW Service.jpg
    144.9 KB · Views: 0
  • VZW T Buildings.jpg
    VZW T Buildings.jpg
    134.4 KB · Views: 0

bob

Senior Member
Location
Alabama
Something like this assuming a 600 amp is adequate for the load. Have you done a load study? Check previous max
demand from utility? note that the taps are a max of 10 ft. If over 10 Ft, the 25 Ft rules apply. Note this is for a 400 amp installation.

 