sparky_magoo
Senior Member
- Location
- Reno
I went on a service call today. I tore out a huge load of surface mount lighting. The lights were connected together with 18/2 zip cord. I installed six 6" remodel cans in place of the surface mount garbage. I powered the new cans from one existing can. When I hooked up the new cans to the one "legitimate" can, I found the black was still hot. The switch was turned off. After some investigation, I discovered the existing ckt., I tied into, is switching the nuetral. It's four o'clock. I'm already off work. My helper is stressing out. We have already installed nineteen new lights in Lady's house. I let it slide and tell her I must come back to change how the ckt. is switched. I believe we will get more money out of her for other work. I tell her one hour to correct the problem.
Question. Was I wrong to leave the lighting ckt. connected with the nuetral leg being switched, as opposed to the hot leg being switched. Again. I do believe she will pay to correct the problem.
Question. Was I wrong to leave the lighting ckt. connected with the nuetral leg being switched, as opposed to the hot leg being switched. Again. I do believe she will pay to correct the problem.