I am from outside of the USA. We do however enfore the NEC as our local electrical code. We have a single electrical supply who is requesting to replace meters and main feeders without the requirement of an electrical approval. We are abit uneasy about allowing this and I thought I would ask the following questions;
1. I would like to know what is the regular practise in the industry for the replacement of meterbases if one of the lugs are curroded. Is a electrical inspection required for this?
2. Is an electrical inspection usually required for replacing meterbases and/or conductors that have burnt out due to electrical fire.
Does the NEC make any specifications as to theses situations.
1. I would like to know what is the regular practise in the industry for the replacement of meterbases if one of the lugs are curroded. Is a electrical inspection required for this?
2. Is an electrical inspection usually required for replacing meterbases and/or conductors that have burnt out due to electrical fire.
Does the NEC make any specifications as to theses situations.