Required clearances for 12KV Feeders in RGD from other raceways above ground install

Status
Not open for further replies.
Can someone point me in the right direction of the code section which indicates the required spacing/clearances of 12KV feeders installed in Rigid conduit from other electrical raceways for 480v wiring in a commercial/aboveground wiring installation? I believe the green book requires 12", but the section in question is past the 'Point of service' connection point, and no longer under PG&E's scope. I'd like to confirm how close I can space it to other conduits/raceways.

thanks.
 