Hello everyone, I was hoping to get some input on here for a discussion I was having with a colleague.

What exactly determines the "Level" and "Class" of generator installation as described in NFPA 110? When exactly would these come into effect?

I understand that level 1 is required when loss of human life is possible. All the buildings I designed have always been Level 1, class 10, but when would you have a "type 60"?

Last, in your opinion, whose job would it be to enforce this?