Does anyone know of a NEC reference or other reference that have requirements for when a short circuit and coordination study should be updated? In most cases I believe these studies should be updated anytime a significant change such as a facility expansion or the addition/replacement of electrical equipment.
Even without any changes taking place is there a documents requirement or suggestion for updating these studies? I know NFPA 70E 130.5 (2) requires AF studies to be updated every 5 years or when a significant change takes place, but I am looking for something that relates specifically to just the Short Circuit and coordination.
Should utility fault current contribution be reviewed/updated every so often to confirm that it has not increased due to changes no the utility system (even though most of the time utility just provides max let-thru on SE transformer)
Any requirements specifically related to healthcare facility?
Even without any changes taking place is there a documents requirement or suggestion for updating these studies? I know NFPA 70E 130.5 (2) requires AF studies to be updated every 5 years or when a significant change takes place, but I am looking for something that relates specifically to just the Short Circuit and coordination.
Should utility fault current contribution be reviewed/updated every so often to confirm that it has not increased due to changes no the utility system (even though most of the time utility just provides max let-thru on SE transformer)
Any requirements specifically related to healthcare facility?