i am installing a 600 amp service on a new house. i will be mounting a ct cabinet. the house will have a 150kw generator with an automatic switch. my question is when i exit the ct cabinet can i go directly into the automatic swith then to my subpanels or will i have to go into maby a disconnect first then to the transfer swith before hitting the subpanels. TY