kwired
Electron manager
- Location
- NE Nebraska
Why is anyone talking about sync? If you have two manual transfer switches, or even ATS's, each genny feeds separate load centers even though the load centers are fed from the same panel. Nothing goes back through the panel; "Never the twain shall meet". Don't make it more complicated than necessary.
It was not made all that clear if we are supplying same load(s) with two generators or if each generator is to supply separate loads.
Syncronization becomes necessary if both are to supply same loads