starsandstripes
Member
- Location
- SE Michigan
Anyone care to throw out a price on this one?
200 amp service new construction on modular with full basement, vinyl siding. The panel (with existing circuits landed) is hanging from the trusses and needs to be mounted. 2" pvc from the meter into the ground for poco; 200 amp outdoor disc; about 75' ser cable to panel; two ground rods and about 100' #4 to water meter. Thanks.
200 amp service new construction on modular with full basement, vinyl siding. The panel (with existing circuits landed) is hanging from the trusses and needs to be mounted. 2" pvc from the meter into the ground for poco; 200 amp outdoor disc; about 75' ser cable to panel; two ground rods and about 100' #4 to water meter. Thanks.