Hi, I'm bidding a restaurant and have a couple of questions:
1) 220.88 shows an optional way of calculating service conductors. What constitutes a "new" restaurant. The building is existing and was a bakery in its last incarnation (30 years ago).
2) How do I determine which demand factor to use? How are "All Electric" and "Not All Electric" Restaurant Calculated Loads defined. Do I use one or the other or a combination of the two?
3) A contractor friend told me that ALL receptacles in the restaurant had to GFCI protected. I haven't been able to find any mention of this in the code book.
Thanks.
Rich
1) 220.88 shows an optional way of calculating service conductors. What constitutes a "new" restaurant. The building is existing and was a bakery in its last incarnation (30 years ago).
2) How do I determine which demand factor to use? How are "All Electric" and "Not All Electric" Restaurant Calculated Loads defined. Do I use one or the other or a combination of the two?
3) A contractor friend told me that ALL receptacles in the restaurant had to GFCI protected. I haven't been able to find any mention of this in the code book.
Thanks.
Rich