Nietz001
Member
- Location
- St Paul MN
I have been asked to install a piece of equipment to the supply air ductwork above a return air plenum ceiling. The equipment is equipped with a 6? cord to be plugged into a 125 volt receptacle above the ceiling. Considering this is a return air plenum is this a legal installation? I have no idea if the cord is rated to be installed in the RA ceiling.
Please help
Jeff
Please help
Jeff