Don't have anything like that during the bidding stage.If your layout is that complicated, perhaps a 3D drawing like a plumbing diagram would help.
View attachment 2572151
Don't have anything like that during the bidding stage.If your layout is that complicated, perhaps a 3D drawing like a plumbing diagram would help.
View attachment 2572151
So you work for one of those contractors where the office buys all the material and tells the foreman to make it work? Very often the more expensive material results in a lower installed cost because of the labor....with billing rates of about $3/minute around here a bit of labor savings really adds up.So I'd like to estimate as close to actual as possible. My assembly lets me choose prefab or field bend elbows. There should be a guideline for when bends would happen over prefab elbow and vice versa.