Does the NEC call for the use of expansion fittings when crossing a building expansion joint between two buildings in a suspended slab using Rigid Nonmetallic Conduit (PVC)? If so please site the section of the code where this is called out.
This expansion joint is 2". Another words the buildings are only 2" apart from each other
This expansion joint is 2". Another words the buildings are only 2" apart from each other
Last edited: