While doing a walk thriugh on a new building that we are in the proccess of building I noticed the contractor had run 2 panels side by side with 2 two inch chace nipples between them. One at the top and one at the bottom of the enclosures. In the nipple at the top were the 3 phase conductors and the equipment grounding conductor. In the bottom chase nipple was the neutral conductor. I have never seen this before and have looked in the code and my first say on this is code violation. Can you help me out? Or is this acceptable?