My company installs industrial ceiling fans and I have a question regarding a specific set up.
The fans are assembled with a 10’ 12/3 MC whip, but it is usually cut down to 5’ or 6’.
In this scenario there will be 3 fans on one circuit.
We intend to use a 30amp breaker and 10 awg THHN ran in 3/4” EMT to a junction box mounted at each fan location where we will tie in the 12/3 whip and continue the 10awg on to the next fan.
Is this considered up to code? Since 12/3 is rated for 20amps but there is a 30amp ocpd?
Any help is appreciated. Thanks
My company installs industrial ceiling fans and I have a question regarding a specific set up.
The fans are assembled with a 10’ 12/3 MC whip, but it is usually cut down to 5’ or 6’.
In this scenario there will be 3 fans on one circuit.
We intend to use a 30amp breaker and 10 awg THHN ran in 3/4” EMT to a junction box mounted at each fan location where we will tie in the 12/3 whip and continue the 10awg on to the next fan.
Is this considered up to code? Since 12/3 is rated for 20amps but there is a 30amp ocpd?
Any help is appreciated. Thanks