I NEED INFO ON LOCK-OUT/TAG-OUT PROCEDURES WHEN DEALING WITH UTILITY POWER. OUR UTILITY COMPANIES IN CENTRAL PA. ARE DO NOT ALLOW US TO PLACE LOCK-OUT DEVICES ON ANY OF THEIR EQUIPMENT. ON BUILDING SHUT-DOWN PROJECTS[ESPECIALLY ON GEAR THAT DOES NOT HAVE A MAIN BREAKER]WE ARE FORCED TO DEPEND ON GROUNDING DEVICES FOR OUR PROTECTION. POLE MOUNTED CUT-OUTS POSE THE SAME PROBLEM. WHAT WRITTEN PROCEDURE CAN BE FOLLOWED FOR THESE EXAMPLES?