Make sure you either have the unit on hand or have access to good specs.
Getting low voltage cable to control panel could be an issue. If possible, a 1-inch smurf tube or similar should be sufficient if you can't get the cable at time of rough-in.
Last one I messed with, the builder tried to put the unit under a seat in the shower. No access, I was like....umm no.