I recently did a 200 amp temp service consisting of 6' of sch.80 pvc out of the transformer into a meter base , and back out of a 200 amp fused disc. Out of the disc. I ran 380' of sch 80 pvc above ground on a grassy area and onto the edge of a fenced in parking area keeping the pvc as tight and close to the fence line as possible . I then staked the pvc down with 2' sticks of emt on both sides of every coupling. I must add the pvc that is running along side the fence is in between job trailers and fence . please tell me where I went wrong.